Page 4 of 4
Re: Club marshalling yard design hints
Posted: Mon Nov 17, 2014 10:44 pm
by David Hale
Saturday 15th November 2014
Several tons of rubble were delivered to the site on Wednesday.
With another early start today, Roger had it spread and rolled by 10.00am. Much easier than shovel and barrow!
- P1020389 red.jpg (128.76 KiB) Viewed 20907 times
Twenty tons of road planings are due to be delivered this coming Wednesday to "blind" the rubble, and provide our working level.
David.
Re: Club marshalling yard design hints
Posted: Wed Nov 19, 2014 6:17 pm
by David Hale
Wednesday 19th November 2014
The day was begun by setting level pegs to indicate the depth to which road planings would be spread, allowing for the thickness of the concrete to provide the running surface.
An ESSMEE member, farmer David Sedgman, who has access to a large dump trailer, arrived at noon with the first load, and by mid afternoon this had been spread as shown below.
- Looking north east with the first load levelled
- P1020393 red.jpg (95.56 KiB) Viewed 20888 times
Shortly afterwards, David arrived with the second load, making 21 tonnes in total. A start in spreading this will be made on Saturday.
- Looking south east with the second load awaiting attention
- P1020394 red.jpg (116.11 KiB) Viewed 20888 times
Progress is being made!
David.
Re: Club marshalling yard design hints
Posted: Wed Nov 26, 2014 10:03 pm
by David Hale
Wednesday 26th November 2014
Road planings compacted, and ready for shuttering.
- P1020404 red.jpg (97.72 KiB) Viewed 20851 times
Re: Club marshalling yard design hints
Posted: Wed Nov 26, 2014 11:53 pm
by Dave Noble
Impressive progress David, very much looking forward to playing on it next year.
Re: Club marshalling yard design hints
Posted: Thu Nov 27, 2014 4:16 pm
by David Hale
Hello Dave.
Thanks for your support. We'll do our best not to disappoint.
David.
Re: Club marshalling yard design hints
Posted: Thu Dec 18, 2014 7:19 pm
by David Hale
Shuttering for the arrivals road of the new yard was completed on Wednesday 10th December, and the concrete was poured on Saturday 13th.
The shuttering was removed yesterday, and the results can be seen in the pictures.
- Looking South. The pad in the foreground is for a new turnout connecting to the main line.
- P1020405 red.jpg (117.01 KiB) Viewed 20619 times
- Looking north.
- P1020406 red.jpg (102.24 KiB) Viewed 20619 times
Weather permitting, work will start again in early January 2015.
In the meantime, best wishes for Christmas and the New Year to all GL5 members from ESSMEE.
David
Re: Club marshalling yard design hints
Posted: Thu Aug 13, 2015 8:27 pm
by David Hale
Nearly there!!
A long time since my last posting regarding progress on the lower yard at the Bath and West Railway.
As can be seen from the pictures three of the four roads are complete, and with rail on order, road four should be finished by mid September in good time for ESSMEE Open weekend - 3rd and 4th October 2015.
Please put the date in your diary.
Unfortunately, the return link to the main line will not be in place until some time next year since future work will be concentrated on the replacement of track serving the carriage shed adjacent to the club building.
- Lower yard looking north
- P1020693 - red.jpg (120.04 KiB) Viewed 20187 times
- Lower yard looking south - awaiting return turnout to main line
- P1020694 - red.jpg (119.66 KiB) Viewed 20187 times
David Hale
Re: Club marshalling yard design hints
Posted: Fri Aug 14, 2015 11:48 pm
by Alan Wood
Looks good David , did you lengthen the headshunt in the end as when we were there it looked a bit short for a loco and driving truck , hope to get down for the open weekend , perhaps only 1 day .
Re: Club marshalling yard design hints
Posted: Tue Aug 18, 2015 9:58 pm
by David Hale
Hello Alan.
It has been lengthened but far less than I had suggested was desirable especially as there was more than enough space available. Hopefully it can be extended further at a later date.
Look forward to seeing you at the open weekend.
Re: Club marshalling yard design hints
Posted: Wed Feb 24, 2016 9:12 pm
by David Hale
Having waited for all the leaves to fall from the trees alongside the main line, both upper and lower yards have now had the ballast spread. Much improved appearance now.
It's anticipated that the next job will be to add a passing loop to the line between the two yards.
- Upper Yard looking south
- P1020899 - red - Upper Yard.jpg (110.13 KiB) Viewed 19530 times
- Lower Yard looking north
- P1020901 - red - Lower Yard.jpg (118.18 KiB) Viewed 19530 times
David.
Re: Club marshalling yard design hints
Posted: Thu Feb 25, 2016 9:44 am
by LNER MAN
Hi David, that's great progress. Regards Ballan.
Re: Club marshalling yard design hints
Posted: Fri Feb 26, 2016 9:26 pm
by David Hale
Thanks Ballan.
Re: Club marshalling yard design hints
Posted: Fri Feb 26, 2016 9:53 pm
by David Hale
Norman Yorke, the oldest member of ESSMEE died recently at the age of 93 years. When the club began developing our site at the the Bath and West Showground, Norman donated a small timber building for use as a signal box. Subsequently, when a new box was constructed, the old one was moved to stand between the main line and the 5" yard.
Towards the end of last year the box was repainted in the old Southern Region colours, and at a recent meeting of the 5" group it was decided to call it YORKE BOX as a memorial to Norman. Southern style nameplates were made and fitted to the box during this week.
- East front of Yorke Box
- P1020904 - red - Yorke Box from east.jpg (110.26 KiB) Viewed 19499 times
- West front of Yorke Box
- P1020907 - red - Yorke Box from west.jpg (86.44 KiB) Viewed 19499 times
David.
Re: Club marshalling yard design hints
Posted: Tue Mar 22, 2016 11:26 am
by Richard Phillips
David,
Sorry I didn't see this message before, and sad news about Norman - I certainly remember him! I remember also going to collect this signalbox from his garden and following it back to the showground, hoping it wouldn't collapse and be collected by my car! I think Kevin spray painted something like "Doctor Who on tour" on the base, his knowledge of knots helped lash it to a trailer. This 'box had a history as a customs shed at Bristol Docks?
I remember the work you put in restoring this as the ESSMEE MKI signalbox, and it served it's purpose very well. It's good to see it in continued use.
Re: Club marshalling yard design hints
Posted: Thu Mar 24, 2016 1:10 pm
by David Hale
Hello Richard.
Yes, Norman was quite a character, and will be sorely missed. His Widow, Eppie, was very pleased when I suggested naming the old box "Yorke Box" as a memorial to him. We hope to get her down to the showground at some time to see it, or perhaps even carry out a ceremonial unveiling.